Our Track Record

Projects delivered across South Africa.

Over R4.3 billion in cumulative construction value across 19 major roads and civil engineering contracts for SANRAL, KZNDOT, RAL and Transnet.

Featured projects

Recent flagship work.

A snapshot of current and recently completed appointments.

SANRALEastern CapeAug 2024 – Present

East London Bypass — R72 & N2 Concept & Preliminary Design

Concept and preliminary design of the East London bypass linking National Route R72 Section 4 and N2 Section 15.

R 1.2 billion Estimated construction value
SANRALEastern CapeJul 2024 – Sep 2026

Cofimvaba Cutting — Slope Stability Measures

Slope stability measures for the Cofimvaba Cutting on Regional Route 61 Section 5 at Km 45.30.

R 41 million Construction value
SANRALLimpopoMar 2022 – Oct 2024

N11 Section 12 — Periodic Maintenance

Periodic maintenance from Km 76.1 to Km 85.59, scope developed from resurfacing to rehabilitation including BSM and Cape Seal.

R 152 million Construction value
KZNDOTKwaZulu-NatalJan 2023 – Sep 2024

Main Road P2-2 — Emergency Flood Repairs

Emergency repairs across three sites between Fairbreeze and KwaDukuza following the April 2022 floods.

R 50 million Construction value
SANRALNorthern CapeAug 2023 – Oct 2024

N10 Section 7 — Periodic Maintenance

48.3 km of periodic maintenance from Km 0.00 to Km 48.3.

R 156 million Construction value
SANRALMpumalangaJul 2022 – Oct 2024

Emalahleni TCC Group — Special Maintenance

Special maintenance of the Emalahleni group of Traffic Control Centres and lay-bys across N4, N11, R35, R38, R555 and R575 (11 sites).

R 95 million Construction value
Full project schedule

Complete list of contracts, 2022 to present.

Filter by client to explore our full portfolio.

Date Contract Client & Location Description Value (ZAR)
Jan 2022 – Dec 2023 RAL/C1111/2021 — Design and Supervision of Road D3348, Mongalo to Monyebodi RAL — Limpopo (Capricorn District) Upgrade of D3348: rehabilitation & geometric upgrades R 70,000,000
Mar 2022 – Oct 2024 N.011-120-2021/4F — Resurfacing, N11 Section 12, Km 76.1–85.59 SANRAL — Limpopo Periodic maintenance (scope changed to rehabilitation incl. BSM + Cape Seal) R 152,000,000
Jul 2022 – Oct 2024 N.004-057-2019/1F — Special Maintenance, Emalahleni TCC Group & Laybys SANRAL — Mpumalanga (Emalahleni/Middelburg) Special maintenance of Emalahleni TCC group and lay-bys (11 sites) R 95,000,000
Jul 2022 – May 2024 C.004-038-2020/1F — Pedestrian Facilities, R22 Section 4, Mseleni–Phelendaba SANRAL — KwaZulu-Natal Improvement of pedestrian facilities: pavement rehab, sidewalks R 55,000,000
Aug 2022 – Jun 2024 N.011-100-2022/1F — Kranspoort Compulsory Truckstop, N11 Section 10 SANRAL — Mpumalanga Safety assessment & geometric design of compulsory truckstop R 50,000,000
Jan 2023 – Sep 2024 P.004-055-2022/1F — Emergency Repairs, Main Road P2-2 KZNDOT — KwaZulu-Natal Emergency flood repairs (3 sites, post-April 2022 floods) R 50,000,000
Jan 2023 – Aug 2024 P.004-061-2022-1F — Flood Repairs, Nonoti River Bridge, P107 SANRAL — KwaZulu-Natal Flood repairs at Nonoti River Bridge, Doesburg (post-April 2022 floods) R 12,000,000
Jul 2023 – Oct 2024 N.005-030-2021/2F — Rehabilitation, N5 Section 3, Bethlehem SANRAL — Free State Pavement and materials design; preliminary design stage R 250,000,000
Aug 2023 – Oct 2024 N.010-070-2022/1F — Periodic Maintenance, N10 Section 7 SANRAL — Northern Cape 48.3 km periodic maintenance, Km 0.00–48.3 R 156,000,000
Sep 2023 – Oct 2024 R.031-010-2022/1F — Periodic Maintenance, R360 & R31, Upington–Rietfontein SANRAL — Northern Cape 258.35 km periodic maintenance R 46,000,000
Jul 2024 – Sep 2026 R.061-050-2020/3 — Slope Stability, Cofimvaba Cutting, RR61 Section 5 SANRAL — Eastern Cape Slope stability measures at Km 45.30 R 41,000,000
Jul 2024 – Present X.003-075-2024/1 — Slope Stabilisation, N2 Section 13, Stone Crescent SANRAL — Eastern Cape Slope stabilisation: three cut slopes & one fill slope, Km 41.10–43.50 R 203,000,000
Aug 2024 – Present R.072-040-2022/1P — East London Bypass Concept & Prelim Design SANRAL — Eastern Cape Concept & preliminary design: bypass linking R72 and N2 R 1,200,000,000
Dec 2024 – Present R.063-070-2026/1F — Special Maintenance, R63 Section 7 SANRAL — Eastern Cape Pavement & materials design specialist, EC Border–Dassiesfontein R 475,000,000
Jan 2025 – Present ZNB00367 — Earthworks, Layerworks, Drainage & Surfacing, P712 White Hill KZNDOT — Durban Region Upgrade gravel to blacktop: earthworks, layerworks, drainage, surfacing, retaining structures R 123,600,000
Jan 2025 – Present ZNB00368 — Upgrade of Main Road P104, 18+000–24+000 Km KZNDOT — Durban Region Construction supervision, contract administration & design support R 143,660,000
Jan 2025 – Present X.004-130-2024/1F — Remediation of Failed Slope, R74, Harrismith SANRAL — Free State Barrier safety report & pavement design for temporary/permanent works R 120,000,000
Jan 2025 – Present N.002-280-2020/1S — Port Dunford Underpass Interchange, N2 Section 28 SANRAL — KwaZulu-Natal Construction supervision, contract administration & design support R 140,000,000
Sep 2026 – Present 26060 — Transnet Berth 210 Masterplan: Conveyance Options Transnet — KwaZulu-Natal Corridor route determination & depot siting for a ~165 km bulk liquid pipeline, Empangeni to the Port of Durban (TNPA Berth 210 masterplan) R 1,000,000,000

Full client reference contacts available on request.

Want the full details on any of these?

Client references and project documentation available on request.

Contact us →